Source:
LA Timeshttp://latimesblogs.latimes.com/greenspace/2010/04/gulf-oil-spill-the-halliburton-connection.html Investigators delving into the possible cause of the massive gulf oil spill are focusing on the role of Houston-based Halliburton Co., the giant energy services company, which was responsible for cementing the drill into place below the water. The company acknowledged Friday that it had completed the final cementing of the oil well and pipe just 20 hours before the blowout last week.
In a letter to to Halliburton Chief Executive David J. Lesar on Friday, Rep. Henry A. Waxman (D-Beverly Hills) chairman of the House Committee on Energy and Commerce, and Rep. Bart Stupak (D-Mich.), chairman of the Subcommittee on Oversight and Investigations, called on Halliburton officials to provide all documents relating to "the possibility or risk of an explosion or blowout at the Deepwater Horizon rig and the status, adequacy, quality, monitoring, and inspection of the cementing work" by May 7.
In a statement Friday, Halliburton said "it is premature and irresponsible to speculate on any specific causal issues." The company had four employees stationed on the rig at the time of the accident, all of whom were rescued by the Coast Guard. "Halliburton had completed the cementing of the final production casing string in accordance with the well design," it said. "The cement slurry design was consistent with that utilized in other similar applications. In accordance with accepted industry practice ... tests demonstrating the integrity of the production casing string were completed."
Read more:
http://latimesblogs.latimes.com/greenspace/2010/04/gulf-oil-spill-the-halliburton-connection.html