Democratic Underground Latest Greatest Lobby Journals Search Options Help Login
Google

Relief May Not Come Soon for BP's Runaway Well

Printer-friendly format Printer-friendly format
Printer-friendly format Email this thread to a friend
Printer-friendly format Bookmark this thread
This topic is archived.
Home » Discuss » Archives » General Discussion (1/22-2007 thru 12/14/2010) Donate to DU
 
tekisui Donating Member (1000+ posts) Send PM | Profile | Ignore Thu Jun-24-10 06:45 PM
Original message
Relief May Not Come Soon for BP's Runaway Well
Source:McClatchy

WASHINGTON — The saga of BP's runaway Deepwater Horizon well, already entering its third month, has entered a crucial phase that will determine whether the Gulf of Mexico gusher ends in mid-August or persists, perhaps for months.

Unlike the previous public drama, this act will unfold miles below the seabed, as drill technicians begin delicately maneuvering a relief well that they hope will pierce and cap the gushing oil well.


This week, BP began using sensitive electronic equipment to detect differences in the rock's electromagnetic field in an effort to pinpoint the metal pipes inside the wellbore. Based on what they find, they'll make adjustments every few hundred feet in an effort to intercept those pipes and kill the gusher by pumping it full of tons of heavy drilling mud and then concrete.

The stakes riding on those adjustments are enormous, and the chance of failure, at least on the first try, is huge.

"The engineers will tell you that they have a 95 percent chance of success" in killing a runaway gusher with a relief well, said Bruce Bullock, the director of the Maguire Energy Institute at Southern Methodist University in Dallas. "But that depends on how you define success. It's quite unlikely they'll hit it on the first stab."

"They're aiming at a salad plate thousands of feet down," Bullock said: a 7-inch pipe buried in concrete, 12,000 feet below the seafloor.

Every time a relief well misses, its crew must back up the drill bit and try again. Last year, a relief well aimed at capping a blowout in the Timor Sea off Australia missed its target four times before connecting. Each new effort took an average of another week of drilling, for a total delay of 27 days after the drillers began closing on their target.


Read more: http://www.mcclatchydc.com/2010/06/24/96510/relief-may-not-come-soon-for-bps.html#ixzz0rojPksqk
Printer Friendly | Permalink |  | Top
ladjf Donating Member (1000+ posts) Send PM | Profile | Ignore Thu Jun-24-10 06:52 PM
Response to Original message
1. Their technology will allow them to "hit the dinner plate". The big
question is whether or not the well casing is intact enough to hold the concrete when it's inserted.
Printer Friendly | Permalink |  | Top
 
DU AdBot (1000+ posts) Click to send private message to this author Click to view 
this author's profile Click to add 
this author to your buddy list Click to add 
this author to your Ignore list Sun May 05th 2024, 08:25 AM
Response to Original message
Advertisements [?]
 Top

Home » Discuss » Archives » General Discussion (1/22-2007 thru 12/14/2010) Donate to DU

Powered by DCForum+ Version 1.1 Copyright 1997-2002 DCScripts.com
Software has been extensively modified by the DU administrators


Important Notices: By participating on this discussion board, visitors agree to abide by the rules outlined on our Rules page. Messages posted on the Democratic Underground Discussion Forums are the opinions of the individuals who post them, and do not necessarily represent the opinions of Democratic Underground, LLC.

Home  |  Discussion Forums  |  Journals |  Store  |  Donate

About DU  |  Contact Us  |  Privacy Policy

Got a message for Democratic Underground? Click here to send us a message.

© 2001 - 2011 Democratic Underground, LLC