The $6.8 Billion Great Wall Of Japan: Fukushima Cleanup Takes On Epic Proportion
More than four years after the catastrophic tsunami that crippled several nuclear reactors in Fukushima, the Japanese utility that owns the site is struggling to deal with a continuous flood of radioactive water.
The tsunami knocked off power at the nuclear plant, which led to the meltdown of three of the six reactors, with a fourth severely damaged. The ongoing release of radioactive material has prevented anyone from entering parts of the complex.
But getting a handle on the mess, let alone permanently cleaning up the site, has been extraordinarily difficult. The problem is the daily flood of rainwater that flows downhill towards the sea, rushing into the mangled radioactive site. An estimated 300 tons of water reaches the building each day, and then becomes contaminated. TEPCO, the utility that owns the site, has been furiously building above ground storage tanks for radioactive water. Storing the water prevents it from being discharged into the sea, but this Sisyphean task does nothing to ultimately solve the problem as the torrent of water never ends. TEPCO has already put more than 500,000 tons of radioactive water in storage tanks.
To reduce the 300 tons of newly created radioactive water each day, TEPCO must cut off the flow of groundwater into the nuclear complex. To do that, it plans on building an ice wall that will surround the four reactors. TEPCO plans on building an intricate array of coolant pipes underneath the reactors, freezing the soil into a hardened ice wall that will block the flow of water. The ice wall will stretch one and a half kilometers around the reactors.
Read more: http://oilprice.com/Alternative-Energy/Nuclear-Power/The-6.8-Billion-Great-Wall-Of-Japan-Fukushima-Cleanup-Takes-On-Epic-Proportion.html