Welcome to DU!
The truly grassroots left-of-center political community where regular people, not algorithms, drive the discussions and set the standards.
Join the community:
Create a free account
Support DU (and get rid of ads!):
Become a Star Member
Latest Breaking News
General Discussion
The DU Lounge
All Forums
Issue Forums
Culture Forums
Alliance Forums
Region Forums
Support Forums
Help & Search
General Discussion
Related: Editorials & Other Articles, Issue Forums, Alliance Forums, Region ForumsMosul dam engineers warn it could fail at any time, killing 1m people
Source: The Guardian
Mosul dam engineers warn it could fail at any time, killing 1m people
Iraqis who built dam say structure is increasingly precarious and
describe government response as ridiculous
Julian Borger World affairs editor
Wednesday 2 March 2016 07.00 GMT
Iraqi engineers involved in building the Mosul dam 30 years ago have warned that the risk of its imminent collapse and the consequent death toll could be even worse than reported.
They pointed out that pressure on the dams compromised structure was building up rapidly as winter snows melted and more water flowed into the reservoir, bringing it up to its maximum capacity, while the sluice gates normally used to relieve that pressure were jammed shut.
The Iraqi engineers also said the failure to replace machinery or assemble a full workforce more than a year after Islamic State temporarily held the dam means that the chasms in the porous rock under the dam were getting bigger and more dangerous every day. A contract with an Italian construction firm for carrying out urgent repairs has yet to be signed, but behind-the-scenes negotiations with Baghdad continue.
The engineers warned that potential loss of life from a sudden catastrophic collapse of the Mosul dam could be even greater than the 500,000 officially estimated, as they said many people could die in the resulting mass panic, with a 20-metre-high flood wave hitting the city of Mosul and then rolling on down the Tigris valley through Tikrit and Samarra to Baghdad.
One of the Iraqi engineers, now living in Europe, described as ridiculous the Iraqi governments emergency policy of telling local people to move 6km (3.5 miles) from the river banks.
[font size=1]-snip-[/font]
Iraqis who built dam say structure is increasingly precarious and
describe government response as ridiculous
Julian Borger World affairs editor
Wednesday 2 March 2016 07.00 GMT
Iraqi engineers involved in building the Mosul dam 30 years ago have warned that the risk of its imminent collapse and the consequent death toll could be even worse than reported.
They pointed out that pressure on the dams compromised structure was building up rapidly as winter snows melted and more water flowed into the reservoir, bringing it up to its maximum capacity, while the sluice gates normally used to relieve that pressure were jammed shut.
The Iraqi engineers also said the failure to replace machinery or assemble a full workforce more than a year after Islamic State temporarily held the dam means that the chasms in the porous rock under the dam were getting bigger and more dangerous every day. A contract with an Italian construction firm for carrying out urgent repairs has yet to be signed, but behind-the-scenes negotiations with Baghdad continue.
The engineers warned that potential loss of life from a sudden catastrophic collapse of the Mosul dam could be even greater than the 500,000 officially estimated, as they said many people could die in the resulting mass panic, with a 20-metre-high flood wave hitting the city of Mosul and then rolling on down the Tigris valley through Tikrit and Samarra to Baghdad.
One of the Iraqi engineers, now living in Europe, described as ridiculous the Iraqi governments emergency policy of telling local people to move 6km (3.5 miles) from the river banks.
[font size=1]-snip-[/font]
Read more: http://www.theguardian.com/world/2016/mar/02/mosul-dam-engineers-warn-it-could-fail-at-any-time-killing-1m-people
InfoView thread info, including edit history
TrashPut this thread in your Trash Can (My DU » Trash Can)
BookmarkAdd this thread to your Bookmarks (My DU » Bookmarks)
5 replies, 891 views
ShareGet links to this post and/or share on social media
AlertAlert this post for a rule violation
PowersThere are no powers you can use on this post
EditCannot edit other people's posts
ReplyReply to this post
EditCannot edit other people's posts
Rec (16)
ReplyReply to this post
5 replies
= new reply since forum marked as read
Highlight:
NoneDon't highlight anything
5 newestHighlight 5 most recent replies
Mosul dam engineers warn it could fail at any time, killing 1m people (Original Post)
Eugene
Mar 2016
OP
virtualobserver
(8,760 posts)1. that is horrifying
tk2kewl
(18,133 posts)2. it seems like fixing the flood gates should be the top priority
tabasco
(22,974 posts)3. Would be more blood on the hands of the evil Bush/Cheney cabal.
Even Saddam would have kept his dams in repair.
safeinOhio
(32,715 posts)4. They need Gov Rick Snyder from MI
to handle the PR> great on water projects
snooper2
(30,151 posts)5. Can we trick all the ISIS assholes to get downstream of it?